Services

Our Services

When you hire Electricomm, we follow our proven, systematic process of verifying, documenting, and placing into service newly installed or retrofitted electrical power equipment and systems according to your requirements.

With You Every Step

Just as electrical systems have evolved over the years, so has the process of commissioning. There was a time that commissioning was primarily utilized during the startup phases of a project. Others believed commissioning should be reserved for the final stage of a project as it nears completion. In reality, commissioning success is best achieved when used every step of the way – from pre-design through construction until the final verification is executed. And you can be assured, the expertise of Electricomm will be with you at every stage and step.

Specifically, Electricomm's commissioning services include, but are not limited to, the following:

Lockout Tagout (LOTO)

Lockout Tagout, also known as LOTO, is not only a good practice, but also a legal requirement. OSHA has a rule that requires employers to have LOTO programs in place, as outlined in 29 CFR 1910.147.

In essence, LOTO helps prevent unexpected startup of machinery during maintenance or repair. If energy sources of the machines are not properly isolated and secured, serious injuries, fatalities, property damage, and environmental devastation can result. In addition to preventing such issues, facilities also benefit from LOTO by reducing downtime, costs, and liability that can result.

With LOTO, you not only lockout electrical equipment, but also valves and mechanical components. This is no trivial step – lives depend on quality LOTO – and Electricomm is proud to offer industry-leading talent within our LOTO services so you can be assured you’re working with the very best.

Electricomm - Lock out & Tag out , Lockout station,machine - specific lockout devices and lockout point